  3. Piping operations at Isfahan Refinery

Civil Works for Phase 19 Project

Project overview and importance

Our company is proud to have completed the civil works in the Phase 19 project with the Petropars petrochemical client located in Bushehr-Kangan province. This project, which was defined on a large area of ​​land and aimed at supporting the vital infrastructure of the petrochemical industry, includes a series of buildings, basic facilities, excavation and earthworks, foundation construction, concrete structures, landscaping, etc.

Technical and Execution Challenges

During the execution of this project, several key challenges were encountered, which were successfully addressed through engineering-driven solutions and professional project management:

  • Rapid and precise execution of civil works within a limited timeframe while maintaining high quality standards.
  • Strict compliance with safety, environmental, and quality standards in the sensitive industrial zone of Kangan.
  • Adaptation to the region’s specific environmental conditions, including soil characteristics, humidity, wind, and proximity to the sea, during both design and execution phases.
  • Coordination with other project disciplines to provide suitable civil infrastructure for subsequent mechanical and process installation stages.

Omran Sanat Olia’s Approach and Expertise

To meet these requirements, the company adopted the following strategies:

  • Strong commitment to environmental protection principles and full compliance with HSE requirements to ensure workforce safety and environmental preservation.
  • Deployment of a team consisting of experienced civil engineers, precise client-side supervision, and specialized subcontractors for foundations, concrete structures, and site development works.
  • Continuous quality control, including standard testing procedures (such as concrete testing, sampling, and mechanical tests) and strict adherence to regional and international quality and safety standards.
  • Implementation of detailed scheduling, use of modern equipment, and daily progress reporting to ensure timely and controlled project advancement.

Achievements and Outcome

Strengthening of Omran Sanat Olia’s position as a professional contractor for large-scale industrial civil projects in challenging regions such as Bushehr Province.هر.

Successful project completion and delivery within the scheduled timeframe, with civil infrastructure fully prepared for subsequent mechanical and process installation phases.

Reduction of execution and quality risks through systematic construction practices, precise control, and comprehensive engineering documentation.

Key project information
  • Project location: Bushehr Province, Kangan
  • Employer: Petropars Petrochemical
  • Duration: 28
  • Project start year: 2025
  • Active forces: 50